A frame laid out on the sheathing module
Studs are placed from the end of the wall at a spacing that divides the sheathing board without a remainder, so every board joint has timber behind it. Lintels, cripples, sills, top plates and blocking are created at every opening automatically.
- Stud, joist and rafter spacing set in the project
- A warning when the spacing doesn’t fit the board module
- Manual changes protected by a wall lock